DERC Salotech

How to retrofit older water jetting systems with modern components?

Retrofitting your older water jetting system involves upgrading specific components with modern technology while keeping your existing infrastructure intact. This approach allows you to enhance performance, improve safety features, and add automation capabilities without the expense and downtime of complete system replacement. You’ll typically upgrade control systems, pumps, safety valves, and automation components while maintaining your existing framework, piping, and mounting systems. Most industrial facilities find retrofitting delivers 60-80% of new system performance at roughly half the cost.

What does retrofitting a water jetting system actually mean?

Retrofitting a water jetting system means selectively upgrading components within your existing equipment to incorporate modern technology and improved performance capabilities. Unlike complete replacement where you remove the entire system, retrofitting focuses on strategic component upgrades that breathe new life into your current infrastructure.

The key difference lies in what stays and what goes. During retrofitting, you keep your existing framework, mounting systems, and often your primary piping infrastructure. What changes are the components that directly impact performance, safety, and control. Think of it like renovating a house – you’re not tearing down the structure, but you’re updating the electrical system, plumbing, and appliances to modern standards.

Components that typically get upgraded include:

  • Control panels and automation systems
  • High-pressure pumps and intensifiers
  • Safety relief valves and dump systems
  • Nozzles and cutting heads
  • Monitoring and diagnostic equipment

Components that usually remain include:

  • Main system framework and housing
  • Primary piping and manifolds (if in good condition)
  • Power supply infrastructure
  • Mounting and support structures

Common retrofit scenarios in industrial settings include upgrading manual systems to automated control, replacing worn pumps with more efficient models, and adding remote monitoring capabilities to existing equipment. Many facilities operating systems in the 500 to 3000 bar range find retrofitting particularly beneficial for surface cleaning applications where precision control has become increasingly important.

Which components should you prioritize when retrofitting?

Your retrofit priorities should focus on components that deliver the greatest impact on safety, efficiency, and operational control. Start with control systems and safety features, as these provide immediate benefits in terms of operator protection and system reliability.

Control systems represent your highest priority because modern PLCs and touchscreen interfaces transform how operators interact with equipment. Upgrading from manual controls to digital systems enables precise pressure regulation, automated cycling, and remote monitoring capabilities. These improvements directly impact productivity and reduce operator fatigue during extended surface cleaning operations.

High-pressure pumps come second in priority, especially if your current pumps show signs of decreased efficiency or increased maintenance needs. Performance indicators that signal pump upgrade needs include:

  • Pressure fluctuations exceeding 5% during operation
  • Increased oil consumption or contamination
  • Rising operating temperatures
  • Decreased flow rates at standard pressures
  • Excessive vibration or noise levels

Safety components deserve equal attention with pumps. Modern dump valves, pressure relief systems, and emergency stops provide faster response times and more reliable operation than older mechanical systems. Upgrading these components reduces risk exposure and helps meet current safety regulations.

Automation elements round out your priority list. Adding features like automatic pressure control, programmable cleaning cycles, and remote operation capabilities can significantly improve efficiency. For facilities running multiple shifts, automation upgrades often deliver the fastest return on investment through reduced labour costs and consistent cleaning quality.

How do you ensure compatibility between old and new components?

Ensuring compatibility requires careful attention to technical specifications, connection standards, and system integration requirements. Start by documenting your existing system’s pressure ratings, flow rates, and electrical specifications to establish baseline compatibility parameters.

Pressure ratings form the foundation of compatibility assessment. Your new components must match or exceed the maximum operating pressure of your existing system. For systems operating in the 500 to 3000 bar range, verify that all new components carry appropriate pressure certifications. Pay special attention to transition fittings and adapters, as these often become weak points when mixing old and new equipment.

Connection standards present common challenges when retrofitting. Older systems might use NPT threads while newer components feature metric connections. You’ll need appropriate adapters and possibly custom fittings to ensure leak-free connections. Consider these compatibility factors:

  • Thread types and sizes (NPT, BSP, metric)
  • Flange specifications and pressure ratings
  • Electrical voltage and control signal compatibility
  • Hydraulic and pneumatic connection standards

Control system integration requires careful planning to ensure new digital controls communicate effectively with existing components. Modern PLCs often include compatibility modules for older equipment, but you might need signal converters or interface relays. Work with suppliers who understand both legacy and modern systems to identify the right integration components.

Physical space constraints can complicate retrofits. Measure existing mounting points, clearances, and service access requirements before selecting new components. Some modern equipment offers more compact designs that actually improve accessibility while fitting into existing spaces.

What’s the typical process for planning a retrofit project?

A successful retrofit project follows a structured approach that minimizes disruption while ensuring all components work together seamlessly. Begin with a comprehensive system assessment to establish your starting point and identify specific upgrade needs.

Your system assessment should include:

  1. Complete equipment inventory with model numbers and specifications
  2. Performance testing to establish baseline metrics
  3. Safety system evaluation and compliance check
  4. Maintenance history review to identify problem areas
  5. Operator feedback on current limitations and desired improvements

Component selection comes next, using your assessment data to match new equipment with existing infrastructure. Request detailed compatibility information from suppliers, including dimensional drawings and connection specifications. For complex retrofits, consider having suppliers review your system documentation before finalizing selections.

Installation planning should account for operational requirements and minimize downtime. Create a detailed schedule that includes:

  • Component delivery lead times
  • Pre-installation preparation work
  • System shutdown and isolation procedures
  • Installation sequence and time estimates
  • Testing and commissioning requirements
  • Operator training schedules

Timeline expectations vary based on retrofit scope. Simple control system upgrades might complete in 2-3 days, while comprehensive retrofits involving pumps and automation could require 1-2 weeks. Plan for additional time if custom fabrication or extensive piping modifications are needed.

Testing procedures should verify both individual component function and integrated system performance. Include pressure tests at various operating points, safety system verification, and extended run tests under normal operating conditions. Document all test results for future reference and warranty compliance.

Why choose retrofitting over complete system replacement?

Retrofitting offers compelling advantages when your existing infrastructure remains sound but your control and performance capabilities need updating. The cost differential alone often makes retrofitting attractive, with typical projects delivering modern functionality at 40-60% less than complete replacement.

Financial benefits extend beyond initial costs. Retrofitting allows you to:

  • Spread investments over time through phased upgrades
  • Avoid disposal costs for existing equipment
  • Minimize installation labour through selective component replacement
  • Reduce downtime compared to complete system replacement
  • Maintain familiar equipment layouts that require less operator retraining

Environmental considerations increasingly favour retrofitting. Extending equipment life through modernization reduces waste and conserves resources compared to scrapping functional infrastructure. Many facilities find this approach aligns with sustainability goals while delivering practical benefits.

Performance improvements through retrofitting can match those of new systems in many applications. Modern pumps operating at 500 to 3000 bar deliver better efficiency and reliability than older models, while digital controls enable precision that wasn’t possible with manual systems. For surface cleaning applications, upgraded nozzles and pressure control can significantly improve cleaning effectiveness and consistency.

Retrofitting makes particular sense when your existing system has substantial remaining life in its core components, you need to maintain operations during upgrades, or your facility layout makes complete replacement complicated. However, complete replacement becomes necessary when structural components show significant wear, multiple major components need replacement, or technological advances make your platform obsolete.

How can DERC Salotech help with your retrofit project?

We understand that every retrofit project presents unique challenges, which is why our engineering team specializes in developing custom solutions that seamlessly integrate modern components with your existing infrastructure. Our extensive experience with systems operating across the 500 to 3000 bar range means we can quickly identify the right upgrade path for your specific needs.

Our retrofit support begins with comprehensive system evaluation. We analyze your current equipment, performance requirements, and operational goals to develop a tailored upgrade strategy. This includes compatibility assessment, component selection, and integration planning that ensures your retrofit delivers maximum value.

For complex retrofit challenges, we offer custom engineering solutions that address specific compatibility or performance requirements. Whether you need specialized adapters, custom control interfaces, or modified components to fit existing spaces, our engineering team can develop solutions that make your retrofit project successful.

Training and technical support form an integral part of our retrofit services. We provide comprehensive operator training on new components and control systems, ensuring your team can fully utilize upgraded capabilities. Our technical support continues after installation, helping you optimize performance and troubleshoot any integration challenges.

Our modern components are specifically designed with retrofit applications in mind, featuring flexible mounting options and multiple connection standards. From high-efficiency pumps to advanced control systems, our product range includes everything needed for successful retrofits. We maintain compatibility data for older systems and can recommend the ideal components for your specific equipment and application requirements.

Frequently Asked Questions

How do I know if my water jetting system is too old to retrofit effectively?

Systems become poor retrofit candidates when structural components show significant corrosion, frame integrity is compromised, or when more than 70% of components need replacement. If your system requires constant repairs, experiences frequent leaks in main piping, or uses obsolete technology with no available upgrade paths, complete replacement might be more cost-effective. Generally, systems over 20 years old with extensive wear should be evaluated by a professional to determine if the core infrastructure can support modern components.

What's the typical payback period for a water jetting system retrofit?

Most facilities see retrofit payback within 18-36 months through reduced maintenance costs, improved efficiency, and decreased downtime. Systems with heavy daily use often achieve faster returns, sometimes within 12 months, especially when automation reduces labour requirements. The payback period depends on factors like operating hours, energy savings from efficient pumps, and reduced product waste from improved precision. Track metrics like energy consumption, maintenance hours, and cleaning cycle times before and after retrofitting to calculate your actual ROI.

Can I retrofit my system in phases, or should everything be done at once?

Phased retrofitting is not only possible but often recommended for budget management and operational continuity. Start with control systems and safety components in phase one, followed by pump upgrades in phase two, and automation features in phase three. This approach spreads costs over multiple budget cycles and allows you to evaluate improvements at each stage. Ensure each phase includes compatible components that won't require replacement in subsequent phases, and maintain detailed documentation to ensure consistency across all upgrade stages.

What are the most common mistakes to avoid during a retrofit project?

The biggest mistakes include underestimating integration complexity, skipping proper system assessment, and mixing incompatible pressure ratings between components. Avoid selecting components based solely on price without verifying compatibility, and don't assume new digital controls will automatically work with older mechanical systems without proper interfaces. Always factor in training time for operators and maintenance staff, and never skip proper testing procedures to save time. Document all modifications thoroughly, as this information becomes critical for future maintenance and troubleshooting.

How do I maintain warranty coverage when mixing old and new components?

Warranty considerations require careful planning when retrofitting, as modifications can potentially void existing coverage. Always inform component suppliers about your retrofit plans and get written confirmation that installations won't affect warranties. Many manufacturers offer specific retrofit warranties that cover new components while acknowledging integration with existing equipment. Keep detailed installation records, follow manufacturer guidelines precisely, and use certified technicians for critical components like pumps and safety systems to maintain warranty protection.

What unexpected costs should I budget for in a retrofit project?

Beyond component costs, budget 15-20% for unexpected expenses like custom adapters, additional electrical work, or piping modifications discovered during installation. Hidden costs often include disposal fees for old components, temporary rental equipment if extended downtime occurs, and overtime labour for installation outside normal hours. You might need specialized tools for certain installations, calibration equipment for new sensors, or consulting fees for complex integration challenges. Always include contingency funds for shipping expedites if critical parts are needed quickly.

Questions?

Get in touch with our support team
+31 186 - 62 14 84